04 February 2008
Power Problems
I mean electricity, and control. Looks like the energy infrastructure is operating at 40 percent of capacity, and national needs are about 2.2 times capacity. $10 billion was allocated to the National Integrated Power Projects to fix this problem, but results have not materialized. That's a lot of money with which to do nothing.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment